Main Entrance

Workman putting the last few steel sheets onto the roof of one of the north lights

When all the sheets are in place, the seams are sealed with tar

And finally covered with three layers of felt

Frame work for dividing walls: two layers of soundproofing boards are bolted to one side.

And then an insulation fabric is laid between the mettle uprights...

this is cover with a further two layers of boards

Library...with power cables

Boiler room: the plinths are for the boilers to stand on

Roof with its second layer of felt

Workman laying 3rd and final layer of green felt. This will be covered with Sedum [a type of grass], also, there will be gravel paths running across the roof so the Sedum can be watered in the summer

Sports hall / hall / dining room. The two doors at the back lead into the serving area and kitchens

A classroom

Downstairs toilets

Foundations for the children's centre: this will be bought in by lorry in one piece and lowered into place by crane